Re: new wrangler - ug
When the 2001 model year was done, Jeep Cherokee production was ended
at Toledo South Assembly Plant . That part of the old Willys-Overland plant was torn down. When the 2006 Wrangler model year was over, the rest of the plant was closed and the rest of the building slated for teardown. The eliimination of the in-line 6 will end its production at the old AMC Kenosha Engine Plant. I do not know what product is left in Kenosha. The Liberty and new 4 door Wrangler are assembled in Toledo North Assembly Palnt. This is visible north of I-75 near the intersection with I-280. This is famous for having the body-in-whie and paint departments outsourced. The Grand Cherokee is assembled in the Jefferson North Assembly Plant, the only auto assembly plant in Detoit. |
Re: new wrangler - ug
When the 2001 model year was done, Jeep Cherokee production was ended
at Toledo South Assembly Plant . That part of the old Willys-Overland plant was torn down. When the 2006 Wrangler model year was over, the rest of the plant was closed and the rest of the building slated for teardown. The eliimination of the in-line 6 will end its production at the old AMC Kenosha Engine Plant. I do not know what product is left in Kenosha. The Liberty and new 4 door Wrangler are assembled in Toledo North Assembly Palnt. This is visible north of I-75 near the intersection with I-280. This is famous for having the body-in-whie and paint departments outsourced. The Grand Cherokee is assembled in the Jefferson North Assembly Plant, the only auto assembly plant in Detoit. |
Re: new wrangler - ug
When the 2001 model year was done, Jeep Cherokee production was ended
at Toledo South Assembly Plant . That part of the old Willys-Overland plant was torn down. When the 2006 Wrangler model year was over, the rest of the plant was closed and the rest of the building slated for teardown. The eliimination of the in-line 6 will end its production at the old AMC Kenosha Engine Plant. I do not know what product is left in Kenosha. The Liberty and new 4 door Wrangler are assembled in Toledo North Assembly Palnt. This is visible north of I-75 near the intersection with I-280. This is famous for having the body-in-whie and paint departments outsourced. The Grand Cherokee is assembled in the Jefferson North Assembly Plant, the only auto assembly plant in Detoit. |
3.7 liter V6
I worked for a couple of years at the old Chrysler Mound Road Engine
plant, now razed. The 318 V8, 3.9L V6, and cast iron and cast aluminum V10 engines were made at MRE. The V10 assembly has moved to the Conner Avenue Viper Plant. In some sort of political deal, Chrysler Mack Avenue Engine Plants ! and 2 were built on the site of a former stamping plant in Detroit. Mack 1 which builds the 4.7L V8, the replacment for the 318 went into production in 2001. Mack 2 builds the 3.7L V6, the replacment for the 3.9L V6 and 4.0L I6, and went on-line at the end of 2002. Indianapolis Foundry is now mostly torn down. I believe engine blocks are being imported. Chrysler seems to be getting rid of legacy plants with "difficult" UAW locals. |
3.7 liter V6
I worked for a couple of years at the old Chrysler Mound Road Engine
plant, now razed. The 318 V8, 3.9L V6, and cast iron and cast aluminum V10 engines were made at MRE. The V10 assembly has moved to the Conner Avenue Viper Plant. In some sort of political deal, Chrysler Mack Avenue Engine Plants ! and 2 were built on the site of a former stamping plant in Detroit. Mack 1 which builds the 4.7L V8, the replacment for the 318 went into production in 2001. Mack 2 builds the 3.7L V6, the replacment for the 3.9L V6 and 4.0L I6, and went on-line at the end of 2002. Indianapolis Foundry is now mostly torn down. I believe engine blocks are being imported. Chrysler seems to be getting rid of legacy plants with "difficult" UAW locals. |
3.7 liter V6
I worked for a couple of years at the old Chrysler Mound Road Engine
plant, now razed. The 318 V8, 3.9L V6, and cast iron and cast aluminum V10 engines were made at MRE. The V10 assembly has moved to the Conner Avenue Viper Plant. In some sort of political deal, Chrysler Mack Avenue Engine Plants ! and 2 were built on the site of a former stamping plant in Detroit. Mack 1 which builds the 4.7L V8, the replacment for the 318 went into production in 2001. Mack 2 builds the 3.7L V6, the replacment for the 3.9L V6 and 4.0L I6, and went on-line at the end of 2002. Indianapolis Foundry is now mostly torn down. I believe engine blocks are being imported. Chrysler seems to be getting rid of legacy plants with "difficult" UAW locals. |
Re: new wrangler - ug
Last time I was in Kenosha the AMC final assembly plant was a park.
I drove past the Willys Toledo plant recently, non of it looked torn down but most of it looked idle, though there were lots of new Jeeps in the parking lots. IIRC the Wrangler production was also transferred to the Toldeo North plant when it opened, but I might be wrong. "Jim Peck" <jamesgpeck@gmail.com> wrote in message news:1159104695.097471.232750@k70g2000cwa.googlegr oups.com... > When the 2001 model year was done, Jeep Cherokee production was ended > at Toledo South Assembly Plant . That part of the old Willys-Overland > plant was torn down. When the 2006 Wrangler model year was over, the > rest of the plant was closed and the rest of the building slated for > teardown. The eliimination of the in-line 6 will end its production at > the old AMC Kenosha Engine Plant. I do not know what product is left in > Kenosha. > > The Liberty and new 4 door Wrangler are assembled in Toledo North > Assembly Palnt. This is visible north of I-75 near the intersection > with I-280. This is famous for having the body-in-whie and paint > departments outsourced. > > The Grand Cherokee is assembled in the Jefferson North Assembly Plant, > the only auto assembly plant in Detoit. > |
Re: new wrangler - ug
Last time I was in Kenosha the AMC final assembly plant was a park.
I drove past the Willys Toledo plant recently, non of it looked torn down but most of it looked idle, though there were lots of new Jeeps in the parking lots. IIRC the Wrangler production was also transferred to the Toldeo North plant when it opened, but I might be wrong. "Jim Peck" <jamesgpeck@gmail.com> wrote in message news:1159104695.097471.232750@k70g2000cwa.googlegr oups.com... > When the 2001 model year was done, Jeep Cherokee production was ended > at Toledo South Assembly Plant . That part of the old Willys-Overland > plant was torn down. When the 2006 Wrangler model year was over, the > rest of the plant was closed and the rest of the building slated for > teardown. The eliimination of the in-line 6 will end its production at > the old AMC Kenosha Engine Plant. I do not know what product is left in > Kenosha. > > The Liberty and new 4 door Wrangler are assembled in Toledo North > Assembly Palnt. This is visible north of I-75 near the intersection > with I-280. This is famous for having the body-in-whie and paint > departments outsourced. > > The Grand Cherokee is assembled in the Jefferson North Assembly Plant, > the only auto assembly plant in Detoit. > |
Re: new wrangler - ug
Last time I was in Kenosha the AMC final assembly plant was a park.
I drove past the Willys Toledo plant recently, non of it looked torn down but most of it looked idle, though there were lots of new Jeeps in the parking lots. IIRC the Wrangler production was also transferred to the Toldeo North plant when it opened, but I might be wrong. "Jim Peck" <jamesgpeck@gmail.com> wrote in message news:1159104695.097471.232750@k70g2000cwa.googlegr oups.com... > When the 2001 model year was done, Jeep Cherokee production was ended > at Toledo South Assembly Plant . That part of the old Willys-Overland > plant was torn down. When the 2006 Wrangler model year was over, the > rest of the plant was closed and the rest of the building slated for > teardown. The eliimination of the in-line 6 will end its production at > the old AMC Kenosha Engine Plant. I do not know what product is left in > Kenosha. > > The Liberty and new 4 door Wrangler are assembled in Toledo North > Assembly Palnt. This is visible north of I-75 near the intersection > with I-280. This is famous for having the body-in-whie and paint > departments outsourced. > > The Grand Cherokee is assembled in the Jefferson North Assembly Plant, > the only auto assembly plant in Detoit. > |
Re: new wrangler - ug
I agree, and since I know for a fact that the 2007 Wrangler is available
with two or four doors, and I have seen both versions driving my locale, this would be logical. > > Oh, I see the confusion now, it's a very clumsily written sentence. > > What he SHOULD have said was something like "The 2006 Wrangler is the last > SUV to be offered only as a two door, starting next year both two and four > door models will be offered." > > Jeff DeWitt |
All times are GMT -4. The time now is 02:19 AM. |
© 2024 MH Sub I, LLC dba Internet Brands